Design works:

  • preparation of site or site layout plan;
  • preparation of technical and work projects for buildings’ architecture and constructions;
  • planning of manufacturing (services) technologies;
  • design of communications;
  • design of water supply and sewerage disposal;
  • preparation of heat generation (up to 10 MW power) and supply project;
  • design of heating, ventilation and air conditioning;
  • design of gas pipeline (up 1,6MPa pressure), electrical engineering (400 kV voltage), and electronic communication (telecommunications);
  • design works of alarm, fire alarm, automation, environmental safety;
  • plan preparation of pre-construction and organization of construction works;
  • formation of construction computational pricing plan;
  • preparation of economic evaluation project